PERANCANGAN SISTEM KERJA BAGIAN CUSTOM CLEARANCE PT. GEX DENGAN METODE WORK LOAD ANALYSIS

Danar Saputra, Danar and Basuki Arianto, Basuki and W. Tedja Bhirawa, Bhirawa (2020) PERANCANGAN SISTEM KERJA BAGIAN CUSTOM CLEARANCE PT. GEX DENGAN METODE WORK LOAD ANALYSIS. Jurnal Teknik Industri, 9 (1). pp. 1-20. ISSN 2302 - 2205

[img] Text
450 - Draft Version
Restricted to Registered users only until 1 April 2021.

Download (14kB)
Official URL: https://journal.universitassuryadarma.ac.id/index....

Abstract

PT. GEX is a company engaged in export and import services. at this time the system of division of labor was not made properly which resulted in several problems in shipping containers. some employees often get very heavy workloads that result in late container spending. this problem will be analyzed using the work load analysis method. Based on the results of observation data on pt. gex will be calculated using the work load analysis method. The results of data analysis that have been processed are known to be at the initial operational conditions of input productive percentage of 66% and non-productive 34%, operational output 70% and 30%, and operational finishing 68% and 32%. After analysis became operational input 79.53%, operational output was 86.10%, operational finishing was 83.64%. This custom clearance operational analysis shows that the result is less training by PT. GEX thus causing a delay in the shipping process. Key Word : Work Load Analysis (WLA), sistem kerja, custom clearance

Item Type: Article
Subjects: L Education > LB Theory and practice of education
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Basuki Arianto
Date Deposited: 03 Sep 2020 10:11
Last Modified: 03 Sep 2020 10:11
URI: http://eprints.universitassuryadarma.ac.id/id/eprint/447

Actions (login required)

View Item View Item